Field Guide
How Many Retaining Wall Blocks Do I Need?
Quick answer: Blocks per course = wall length ÷ block length; courses = (wall height + the buried course) ÷ block height. A 20 ft wall 2 ft high in 16 × 6 in blocks is 15 blocks × 5 courses = 75 blocks, 79 with 5% extra, plus 16 caps.
A segmental retaining wall is stacked courses of block on a gravel base, with drainage stone behind it. Count the courses, count the blocks in each, then add the caps, base gravel, drainage stone and pipe.
1. How to Calculate a Retaining Wall (The Math Explained)
Here's the exact process this calculator uses, with a garden wall 20 ft long and 2 ft high in medium blocks (16 in long, 6 in high) as the example.
-
1
Count the courses
Bury the first course: 6 in, or 10% of the wall height if that's more. Then count the courses for the height above ground.
Buried = 6 in ÷ 6 in = 1 course Exposed = 24 in ÷ 6 in = 4 courses Total = 5 courses (2.5 ft of block) -
2
Count the blocks
Divide the length by the block length and round up, then multiply by the courses. Caps run one course along the top.
Per course = 240 in ÷ 16 in = 15 blocks Blocks = 15 × 5 = 75, with 5% waste = 79 Caps = 15, with 5% waste = 16 -
3
Base gravel and drainage stone
The base is a trench 24 in wide and 6 in deep. Drainage stone fills 12 in (you can change this) behind the wall for the full height of block.
Base = 20 × 2 × 0.5 = 20 cu ft = 0.74 cu yd (1.1 tons) Stone = 20 × 1 × 2.5 = 50 cu ft = 1.85 cu yd (2.6 tons) Drain pipe = 20 ft
2. Base, Drainage & Geogrid
| Material | Where it goes | How much |
|---|---|---|
| Base gravel (crusher run, 3/4 in minus) | Compacted trench under the first course | 24 in wide × 6 in deep |
| Drainage stone (#57, clean) | Behind the blocks and in the cores | 12 in wide, full wall height |
| Perforated drain pipe (4 in) | Behind the bottom course, draining to daylight | Length of the wall |
| Geogrid | Between courses, reaching back into the soil | Walls over about 3 ft; 60% of the height deep |
This calculator adds geogrid for walls taller than 3 ft, counting the buried course: a layer on top of the first course and every second course after that, and works out rolls of 4 × 50 ft or 6 × 150 ft. Block makers' charts vary with soil, slope and loads above the wall, so check yours.
3. Building Tips
Level the first course. Every course follows it. Take your time compacting the base and leveling the first row.
Step the base on slopes. On sloping ground, step the base down in block-height steps so every course stays level.
Drain it. Most retaining walls fail from water pressure, not weak block. Use clean stone and a pipe that drains to daylight.
Pro tip: over 4 ft needs an engineer
Many building codes require a permit and an engineered design for retaining walls over 4 ft (measured from the bottom of the buried course; some codes measure from the bottom of the base), or for any wall holding up a driveway, slope or building. The calculator warns you when a wall is that tall.
4. Frequently Asked Questions
How many retaining wall blocks do I need?
Count the courses, including one buried below ground, and multiply by the blocks in each course. A 20 ft wall 2 ft high with 16 × 6 in blocks has 4 courses above ground plus 1 buried, and 15 blocks per course: 75 blocks, or 79 with 5% extra, plus 16 caps.
How deep should the first course of a retaining wall be buried?
Block makers commonly call for burying the first course at least 6 in, or 10% of the wall height, whichever is more. It sits on a compacted gravel base, typically 24 in wide and 6 in deep.
How much gravel do I need for a retaining wall?
Two kinds: a compacted base (usually crusher run) about 24 in wide and 6 in deep under the wall, and clean drainage stone such as #57 about 12 in deep behind it. For a 20 ft wall 2 ft high, that is about 1.1 tons of base and 2.6 tons of drainage stone.
How tall can a retaining wall be without an engineer?
In most places, about 4 ft measured from the bottom of the buried course, so a wall showing 3½ ft above ground can already be at the limit. Walls over that, or holding up a driveway, slope or building, usually need an engineered design and a permit. Your local building department sets the exact rule; some set it lower.
What is the 1/3 rule for retaining walls?
It's an old rule of thumb used two ways: bury about a third of the wall's height, or make the base about a third as wide as the wall is tall. Segmental block walls aren't sized by it; they follow the block maker's tables, usually one buried course (6 in or 10% of the height) on a 6 in compacted gravel base.
How deep should the trench be for a 4 ft retaining wall?
About 12 in deep and 24 in wide for 6 in tall blocks: 6 in of compacted crusher run plus the buried first course. Taller blocks or soft, wet ground need a deeper trench.
When does a retaining wall need geogrid?
Walls up to about 3 ft, counting the buried course, can often stand without it. Taller walls usually need layers of geogrid running back into the soil, typically about 60% of the wall height long, starting on top of the first course and every other course after that. Walls over 4 ft usually need an engineered design and a building permit. The calculator also counts rolls: each roll is cut into pieces that run back into the soil, so the count depends on the roll size.
Do I need a drain pipe behind a retaining wall?
Yes for most walls. A 4 in perforated pipe along the back of the bottom course, surrounded by drainage stone, carries water away so it doesn't build up pressure behind the wall. The calculator counts one pipe the length of the wall.